Beltline Energy withdraws data center proposal in Pacific, Missouri
What's documented Names developer (Beltline Energy), location (Pacific, Missouri), withdrawn proposal with acreage (500 acres).
Summary not yet published. Read the full piece at the source below.
Read the original at Data Center Dynamics → ← Back to home