New site, still in beta. Spot something off or have feedback? Tell us.

9.4GW SMR-powered data center campus proposed in Utah

What's documented Specifies capacity (9.4GW), technology (SMR), location (Utah), and timeline (2028 target).

Summary not yet published. Read the full piece at the source below.

Read the original at Data Center Dynamics →
Share on LinkedIn Share on X Email
← Back to home