Curtis Hall proposes temporary 49.9MW gas power plant for Cardiff data center campus - report
What's documented Names developer (Curtis Hall), location (Cardiff), specific power capacity (49.9MW), and regulatory threshold detail.
Summary not yet published. Read the full piece at the source below.
Read the original at Data Center Dynamics → ← Back to home